<div dir="ltr">Dear CentOS CI User,<br> <br>Please be advised that the CentOS CI 
Staging Openshift cluster is due for scheduled maintenance from 08:00 to
 10:00 UTC on 2023-09-08. During this period necessary updates will be 
applied to the cluster.<div><br>The upgrade is not expected to be 
service affecting, however there might be periods of slight performance 
degradation during this maintenance period. We apologise for any 
inconvenience that this may cause.<br>                       <br> <br>Kind regards,<br>CentOS CI Infrastructure.<font color="#888888"><br clear="all"></font></div><br clear="all"><br><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><font size="2"><span style="font-family:arial,sans-serif">David Kirwan</span></font></div><div><font size="2"><span style="font-family:arial,sans-serif">Senior Software Engineer<br></span></font></div><div><p style="margin:0px"><font size="2"><span style="font-family:arial,sans-serif"><span style="color:rgb(0,0,0)">Community Platform Engineering @ Red Hat<br></span></span></font></p><font size="2"><span style="font-family:arial,sans-serif"><span style="color:rgb(0,0,0)"></span></span></font><p style="margin:0px 0px 6px"><font size="2"><span style="font-family:arial,sans-serif"><span style="color:rgb(0,0,0)">T: +(353) 86-8624108<br></span></span></font></p></div></div></div></div></div></div></div></div></div></div></div></div>