Due to a hardware maintenance (moving some gluster volumes to
Infiniband, so adding/configuring the IB HBAs), we'll have to shutdown
some nodes in the CentOS Infra.

Migration is scheduled for Friday November 19th, 9:30 am UTC time.
You can convert to local time with $(date -d '2014-11-19 09:30 UTC')

The expected "downtime" is estimated to ~180 minutes (multiple things
happening at the same time), but we hope to be able to restart the
whole stack sooner.

Impacted services :
- - IPv6 traffic to www.centos.org (the server will remain online and
accessible through IPv4, only the IPv6-to-v4 reverse proxy we use the
moment will be offline, so AAAA record will even be removed during
that maintenance)
- - http://seven.centos.org

Thanks for your comprehending and patience.

on behalf of the Infra team,
- -- 

Fabian Arrotin
The CentOS Project | http://www.centos.org
gpg key: 56BEC54E | twitter: @arrfab
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v2.0.22 (GNU/Linux)

iEYEARECAAYFAlRsuRoACgkQnVkHo1a+xU47fwCgiKfV3kUtoKefqgpSEhK64CBp
09MAn0Qi3+N6qegcwRkjgghuEnYXijIC
=5f3A
-----END PGP SIGNATURE-----