[CentOS-announce] Infra - CentOS hardware move [cbs]

Tue Jan 6 07:57:16 UTC 2015
Fabian Arrotin <arrfab at centos.org>

-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Due to a hardware move (machines needing to be powered off, moved in
another rack) , some CentOS.org services will be unreachable for a
short period of time.

Impacted services :
* cbs/Community Build System (aka http://cbs.centos.org)
  Koji web/hub and builders will be down

Migration is scheduled for Thursday January 8th, 3:00 pm UTC time.
You can convert to local time with $(date -d '2015-01-08 15:00 UTC')

The expected "downtime" is estimated to ~30 minutes , time needed to
power down, move machines in the rack, power back on

Thanks for your comprehending and patience.

on behalf of the Infra team,
- -- 

Fabian Arrotin
The CentOS Project | http://www.centos.org
gpg key: 56BEC54E | twitter: @arrfab
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v2.0.22 (GNU/Linux)

iEYEARECAAYFAlSrlVwACgkQnVkHo1a+xU6TagCfQkl3slznEBdQ8T8VYKEcY4AM
SDYAnRC0zm+NmlsSVcHoc5b4nHZSN59P
=DR4a
-----END PGP SIGNATURE-----