Due to a hardware replacement, we'll have to power down the hypervisor hosting several VMs, including the ones used for the following impacted services : * https://bugs.centops.org * https://status.centos.org * https://fr.centos.org Hardware maintenance is scheduled for """"Thursay May 24th, 12:00 pm UTC time"""". You can convert to local time with $(date -d '2018-05-24 12:00 UTC') Root cause : a HDD in the array used to host the VMs failed, and there is no hot-swap capabilities, so full "power off" is required to replace the failed HDD and then start the rebuild operation. That means that those services (already impacted) will be slower during the rebuild operation, but at least reachable Thanks for your comprehending and patience. on behalf of the Infra team, -- Fabian Arrotin The CentOS Project | https://www.centos.org gpg key: 56BEC54E | twitter: @arrfab -------------- next part -------------- A non-text attachment was scrubbed... Name: signature.asc Type: application/pgp-signature Size: 198 bytes Desc: OpenPGP digital signature URL: <http://lists.centos.org/pipermail/centos-announce/attachments/20180524/51c1d099/attachment-0006.sig>