Hi folks I deploy a two Dell PowerEdge T300 to test Virtualization with kvm+drbd+heartbaet. The KVM drbd and heartbeat work properly. However, I have doubt!! When the primary node has down, the secondary node start the VM that has original running on primary node... So, this required a full stop of hole system... This is not we wish here... Is there something way to live migrate VM from primary node that was shutdown???? I have no idea how to make this stuff working... Thanks for any help -- Gilberto Nunes